Valentine's Day
Home Kitchen Remodel Photo Albums Jokes Cool Links

 

Back
Up

Cabinets, continued 

With the installation of the bookshelf in the southeast corner and the frame that'll enclose the undercounter refrigerator, Craig finished basic installation of all the cabinets around the walls. (He hasn't yet tackled the island.)
In addition, he began installing the crown molding at the tops of the cabinets.

Back Up